- Factory information: Our factory covers an area of 5,000 square meters and has hundreds of employees on multiple production lines. The monthly production volume exceeds 200,000Piece, and the annual production volume reaches 2.2 million Piece.
- We are a manufacturer specializing in the production of switching power supplies, with a complete range of models and a large inventory, which can be shipped quickly.Each of the switch power is extremely safe and stable after 5 times testing. All of our products have the ISO9001, CE, FCC,CCC, ROHS certification.
- OEM/ODM process:
- Put forward your request or provide a sample.
- Our factory will conduct preliminary communication with you on the product material, process, price, delivery date, etc.
- The customer entrusts our factory to make samples; both parties confirm the samples (signature/seal the samples).
- Both parties sign the contract; the customer pays the deposit.
- Our factory completes material purchase, mold opening, etc., first produces bulk samples and compares the customer’s signature sample (sometimes it needs to be confirmed by the customer); our factory’s QC department quality control personnel come to the workshop for supervision and inspection; customers can also send personnel to me Supervision and inspection of the factory workshop; the two parties maintain communication, promptly reflect and resolve all matters that need to be resolved through negotiation between the two parties during the order production process.
- Our factory will notify the customer to send personnel to our factory for inspection 2-3 days before the delivery date is completed but before the formal packaging of the order; the sample shall prevail during the inspection, and the sampling inspection method.
- After the customer inspects the product as qualified, arrange the balance of the payment for the delivery; our factory assists the customer with the freight formalities including customs declaration and shipping, etc.; the customer can also send a car to the workshop of our factory to pick up the goods.
- Confirm that all the goods are received and complete the contract matters.